Guizhou Jiantan Economic Development Zone Health Industry Park Standard Factory Construction Project
Design and Construction EPC (Second Bidding) Tender Notice
Tender conditions
The tender project for the design and construction of the standard factory building project (EPC) (second bidding) for the Great Health Industrial Park of the Zhangtan Economic Development Zone in Guizhou Province has been approved by the Development and Reform Bureau of Zhangtan County with the approval of “Dongfafa Investment†[2017] No. 172 For construction, the project owner is Guizhou Yitan Lvyuan Standard Factory Management Co., Ltd. The construction fund comes from self-raising, the proportion of project investment is 100%, and the bidder is Guizhou Wutan Lvyuan Standard Factory Management Co., Ltd. The project has already met the conditions for bidding. The project is now undergoing open tendering for the general contract for design and construction.
2. Project overview and scope of tender
2.1 Project Site: Area B, Jingkai Economic Development Zone, Guizhou Province.
2.2 Construction Scale: The total planned land area is 15,1473.8 square meters, and the total construction area is 12,1793.6 square meters, of which the plant construction area is 100489.7 square meters and the living space is 11,760 square meters (expert apartment and dormitory area is 1,054,28 square meters, and the canteen and activity center is 1217.2 square meters. m), ancillary construction area of ​​173.9 square meters, underground construction area of ​​9370 square meters, parking spaces 375. The building plot ratio is 1.0, the building density is 23.6%, and the greening rate is 19.8%. Supporting ancillary works: earthworks, road works, water supply and drainage works, greening projects, traffic engineering, lighting projects, electricity, gas and communications and other projects.
The duration is 395 days (starting from the date of commencement of the supervision unit). The total investment of the project is about 350 million yuan.
2.3 Bidding scope: The design and construction of the project within the scope of the red line shall be completed and accepted as well as the overall handover, repair of defects within the warranty period of the project and warranty work. The specific contents include but not limited to the following:
2.3.1 Design content
2.3.1.1 The design content of this project includes but is not limited to: construction drawing design (including budget checklist), construction process design control and design tracking, engineering design change, construction site coordination service, post-procurement consultation service, professional design coordination service As well as follow-up services such as auditing as-built drawings and quality defect processing.
2.3.1.2 The scope of professional design includes, but is not limited to, general drawings, buildings, structures, water supply and drainage, electrical, HVAC, fire protection, and civil air defense, etc., and is reviewed by relevant authorities of the government.
2.3.2 Construction Content
The total planned land area is 15,1473.8 square meters, and the total construction area is 12,1793.6 square meters, of which the plant construction area is 100489.7 square meters and the living space is 11,760 square meters (expert apartment and dormitory area is 1,054.28 square meters and the canteen and activity center is 1217.2 square meters). The construction area is 173.9 square meters, and the underground construction area is 9,370 square meters. There are 375 parking spaces. The building plot ratio is 1.0, the building density is 23.6%, and the greening rate is 19.8%. Supporting ancillary works: earthworks, road works, water supply and drainage works, greening projects, traffic engineering, lighting projects, electricity, gas and communications and other projects.
2.4 Bid division:
The general contracting for the design and construction (EPC) project is 1 bid.
3. Bidder qualification requirements
3.1 The bid invitation requires the bidder to have Class A for the professional design of the housing construction project, as well as qualifications for the general contracting of the construction project and the above qualifications, 0 performances, and corresponding design and construction capabilities in terms of personnel, equipment, and funds.
3.2 This tender accepts (accepts or does not accept) the Commonwealth bid. The bid for the consortium shall meet the following requirements: (1) Each party to the consortium shall sign a consortium agreement according to the format provided in the bidding documents to clarify the rights and obligations of the consortium leader and the parties; (2) to be composed of the same professional units; The consortium determines the level of qualification according to the unit with the lower level of qualifications; (3) Each party to the consortium shall no longer bid alone or participate in other consortiums in this bidding project.
4. Acquisition of tender documents
5*20MM 6*30MM fuse holder fuse holder fuse holder
Suitable for 5.0 * 20MM fuse
Applicable current: 10A / 250V t-25 to t-70Material: insulator E130i UL 94-V0
Environmental protection products, certified by CE UL VDE CQC
Fuse (fuse), self recovery fuse (PPTC), ESD suppressor, etc.
It is widely used in a variety of electronic and electrical equipment, such as: computer and its peripheral equipment, LCD, battery pack, communication system, audio equipment, automotive industry, testing instruments, industrial control power supply and frequency converter, etc.
Fuse Holder
ShenZhen Antenk Electronics Co,Ltd , https://www.atkconnectors.com